Local Hire Guides

Plant Hire Bodmin: Machines for Moor, Farm and Forest

Excavators, tracked dumpers, tractors, quads and chippers for Bodmin and Bodmin Moor, with advice on granite, peat and common land rules.

  • 4Counties Hire team
  • 12 min read
Lanhydrock House near Bodmin set among wooded parkland and flowering shrubs

For plant hire Bodmin farms, builders and land managers can plan around, we deliver excavators, dumpers, tractors, quads, UTVs, chippers and stone crushers to Bodmin, the villages of Bodmin Moor and the surrounding countryside. Bodmin is an easy run for us straight down the A30, so delivery is usually simple to arrange. WhatsApp us the machine, your postcode and dates, and tell us if the site is up on the moor: the ground there needs a different approach.

Plant hire Bodmin: Bailey low loader trailer
Bailey low loader trailer from the 4Counties Hire fleet.

Bodmin as a delivery hub

Bodmin is around 40 miles from Okehampton along the A30, and it sits where the A30 meets the A38 towards Liskeard and Plymouth and the A389 towards Wadebridge and Padstow. That makes it a natural centre for deliveries across mid and north Cornwall.

From the town we regularly reach Lanivet, Lostwithiel, Wadebridge and Camelford, plus the moorland parishes of Blisland, St Breward, Cardinham, Warleggan and St Neot. The A30 crosses the moor itself, but most farms are reached by narrow lanes and gated tracks. Let us know about cattle grids, gates and weight limits when you book.

Bodmin town itself has its own steady demand, from house extensions and driveways to drainage repairs and yard work on the business parks around the edge of town. Those jobs are on firmer, more ordinary ground than the moor, and a 1.8 to 2.5 tonne zero tail swing excavator with a tracked dumper and a plate compactor covers most of them. Day 1 delivery is often possible for this kind of hire if you get in touch early.

Plant hire Bodmin: working on granite and moorland

Bodmin Moor is a granite upland, and that shapes almost every job up there.

Boulders and shallow rock

The moor is scattered with loose granite boulders, and in many places solid rock is not far below a thin, acidic soil. A 1.8 tonne digger will struggle to lift big boulders or dig to depth in that ground. For fence lines, drainage or footings on the moor, the Sunward SWE 35UF, SWE 60UF or SWE 90UF give the weight and breakout force to make steady progress. If you need a breaker for solid rock, ask us and we will tell you what is available or point you in the right direction.

Peat and wet ground

Between the tors there are areas of peat and bog that will swallow a wheeled machine. Tracked kit with low ground pressure is the only sensible choice: the Mechbadger tracked dumper, the Tracspider 1000kg electric tracked carrier, or the Mak Brent MAK 60 tracked trencher for drainage runs. Walk the route first and avoid the wettest ground where you can.

Weather

The moor is exposed and its weather changes quickly. Low cloud, heavy rain and wind can stop a job, and tracks that were firm in the morning can be soft by afternoon. Build some slack into the hire period.

Common land and protected sites on the moor

Large parts of Bodmin Moor are registered common land, and some areas are protected as Sites of Special Scientific Interest. That can affect what you are allowed to do, even on land you farm.

Under section 38 of the Commons Act 2006, certain restricted works on registered common land, such as fencing and some excavation or resurfacing, need consent before they go ahead. GOV.UK has guidance on consent to construct works on common land. Work on or near an SSSI may also need consent from Natural England. Check the current guidance and get the paperwork in place before you hire, because a machine sitting idle while you wait for consent still costs money.

Hill farm jobs and the kit for them

Most plant hire Bodmin enquiries we get come from farms. These are the jobs that come up again and again:

JobKitNotes
Repairing stony farm tracksValentini 2.3 Leon PTO stone crusher on the John Deere 6155RCrushes surface stone in place to rebuild the track
Rebuilding gateways and feed areasSunward SWE 60UF, Weber MT CR 7 plateDig out, stone up and compact before winter
Loosening compacted grasslandNardi FAST 3m ripperBest done when the soil is reasonably dry
Topping rush and rough grazingSaMASZ Mammut 2.8m flail topperHeavy-duty flail for rough vegetation
Stock checks and fencing runsAODES 525 or 650 quad, CORVUS UTVRiders should be trained and wear a helmet
Remote power for a shed or eventZenessis 25kVA 3-phase genset or PTO gensetAsk us to match a PTO genset to your tractor

The tractors, implements, quads and generators are all on our agricultural equipment hire page. The excavators and compaction kit are on our construction plant hire page.

Forestry and woodland work

The valleys around Bodmin, especially to the east towards Cardinham, are well wooded, and there is plenty of woodland management on private estates and farms. For clearing and processing timber we hire:

  • The GL&D 5.5″ tracked chipper, which is self-propelled and can climb into woodland where a towed chipper cannot reach.
  • The GL&D 6.5″ towable chipper for higher output from a ride or track.
  • The Ifor Williams trailed log splitter for firewood and estate timber.
  • The Venieri 1.63D pivot loader for moving logs and loading trailers.
  • Tracked carriers for getting brash and materials out across soft ground.

Chippers and splitters sit on our landscaping and groundcare equipment page. Always use the correct PPE for chipping and keep a clear exclusion zone around the infeed.

China clay country to the south

South of Bodmin, around Roche, Bugle and towards St Austell, you move into the china clay district. The ground there is very different again, with soft decomposed granite, old clay workings and spoil tips. Jobs on former clay land need care with ground stability, and it is worth getting proper site investigation before building. We cover the whole area from the same delivery route.

Before the machine arrives

  1. Confirm any consents needed for common land or protected sites.
  2. Agree a delivery point the lorry can reach and a firm route for the machine from there.
  3. Check for buried services and overhead lines, which often cross farmland.
  4. Make sure operators are trained. Hire is self-drive unless agreed otherwise.
  5. Arrange insurance for hired plant; we can refer you to insurance4plant.co.uk.

A year on a moorland farm: when to hire what

Hill farms around Bodmin Moor work to the weather and the stock calendar, and the best time for each job is fairly predictable. This table is a guide for planning plant hire Bodmin farmers can fit around lambing, silage and winter housing.

MonthsConditions on the moorJobs and kit that suit
January to FebruaryWet, cold, short days, ground at its softestYard and building work on hardstanding, concrete repairs, planning drainage. Tracked carriers for feeding across wet ground.
March to AprilLambing, ground starting to dry on the slopesQuads and UTVs for stock checks. Small fencing jobs where the ground allows.
May to JuneDrier, longer daysTrack repairs with the Valentini stone crusher, gateway rebuilds, new fence lines with a 3.5 to 6 tonne excavator
July to AugustDriest ground of the yearField drainage, ripping compacted ground, bulk earthworks, shed bases
September to OctoberRain returning, ground still workableHedge and bank trimming from September, rush topping, getting gateways and feed areas stoned before winter
November to DecemberWet and windy, cattle often housedWoodland work, chipping and log splitting, indoor and yard jobs

Hedges on or next to agricultural land in England cannot be cut or trimmed between 1 March and 31 August under the hedgerow management rules, apart from set exemptions. Check the current guidance before planning any hedge work around a delivery or a new fence line.

Quad bike and UTV safety on steep ground

Quads and side-by-side UTVs are among the most useful machines on a moorland farm, and among the most dangerous if used carelessly. HSE’s guidance on ATVs, quad bikes and side-by-side vehicles sets out what is expected on farms. Key points include:

  • Helmets. HSE says you should always wear a suitable helmet on a quad bike, and that helmets would have prevented most of the head-injury deaths it has investigated.
  • Training. All riders should receive adequate training. Side-by-side vehicles carry the same training expectations as quads.
  • Children. Children under 13 are prohibited from using an ATV at work, and carrying a child as a passenger on a quad is illegal.
  • Loads and towing. Stay within the manufacturer’s limits for racks and towed equipment. Overloading makes a quad unstable on slopes.
  • Ground. Walk unfamiliar routes first. Granite boulders hidden in bracken, peat holes and steep banks cause many overturns.

Our AODES 525 and 650 quads, AODES UTV and CORVUS UTV are self-drive like the rest of the fleet, so make sure whoever rides them is trained and has the right PPE before the hire starts.

Worked example: rebuilding a stony farm track

This is an illustrative scenario rather than a real job, but it is one of the most common hill farm projects. Picture 300 metres of rutted farm track running from the yard up to the moorland grazing, with potholes, exposed stone and water running down the wheel ruts every time it rains.

  1. Sort the water first. Most track damage comes from water. A Sunward SWE 35UF or SWE 60UF cuts cross drains or grips at intervals so water leaves the track instead of running down it, and cleans out the side ditch.
  2. Crush the surface in place. The Valentini 2.3 Leon PTO stone crusher on the John Deere 6155R breaks up the existing stone and rebuilds a usable surface without importing as much new material. It needs a tractor of the right size, which is why we hire them together.
  3. Add stone where needed. Soft sections may need extra stone brought in. A tracked dumper moves it along the track without causing new ruts.
  4. Shape and compact. Give the track a slight camber or crossfall so water runs off, then compact with a Weber MT CR 7 reversible plate.
  5. Finish before winter. Leave time for the surface to settle before stock and tractors use it heavily in wet weather.

If the track crosses registered common land or an SSSI, or runs close to a stream, check what consents are needed before work starts.

A project like this typically needs the excavator and dumper for one to two weeks and the tractor and crusher for a few days in the middle, depending on the length of track and how much drainage work it needs. Booking them as one order with staggered start dates keeps the transport simple.

Getting a machine onto the moor

Delivery on the moor follows different rules from a town job. The lorry has to stay on a road or hard track that can take its weight, and the machine tracks the rest of the way. To make that work:

  • Choose a drop-off point on firm hardstanding, a yard or a wide gateway, not a verge that looks firm in summer.
  • Tell us about cattle grids, gates, weight-limited bridges and the steepest part of the lane.
  • Walk the route from the drop-off to the job before the machine arrives, marking soft ground, boulders and ditches.
  • Keep the machine on the route you walked, and avoid turning on the spot on peat or wet grass.
  • Agree with us where it will be left for collection, ideally the same firm point it was dropped at.

If a machine starts to sink

Stop as soon as the tracks start to dig in. Spinning tracks or rocking a machine back and forth only digs it deeper into peat. On an excavator, the boom and bucket can sometimes be used carefully to lift the front of the tracks and lay brash or boards underneath, but only by an experienced operator and never with anyone standing nearby.

If you cannot recover it safely with what you have, call or WhatsApp us before it gets worse, and do not try to tow it out with a chain on an unsuitable point. Prevention is easier: walk the route, avoid the wettest ground and work the soft areas in the driest months.

Plant hire Bodmin town: homes and business parks

Away from the moor, a lot of plant hire Bodmin work is in and around the town. Extensions, garages and driveways in the residential streets, drainage repairs on older terraces, and yard and car park work on the business parks around the edge of town are all common. Typical kit includes:

  • A Sunward SWE 18UF or SWE 25UF zero tail swing excavator for footings and drainage close to boundaries.
  • A Hyundai 500kg tracked dumper for narrow side access.
  • Weber MT CF 2-II Hd or CF 3-II Hd plates for drive and path sub-base, and the VPR 450 roller for block paving.
  • The Weber MT SM 82-3 pavement saw for clean cuts in existing tarmac or concrete.
  • The Baron forced action mixer or Altrad Belle Mini Mix 150 for concrete and screed.

For business park units, the electric forklifts, pallet stackers, scissor lift and floor scrubbers on our warehouse and cleaning equipment page are useful for refits and stock moves.

What affects the cost of your hire

We do not publish hire prices; WhatsApp us for a current quote. Bodmin is an easy run down the A30, but these factors still make a difference:

  • Machine size: heavier excavators for granite cost more to hire and transport.
  • Delivery vehicle and access: a remote moorland drop-off may take longer than a town delivery.
  • Hire length: weekly and monthly rates beat daily ones, and long-term or Flex Hire suits farms needing a machine all season.
  • Grouping: a tractor, crusher and dumper delivered together save separate trips.
  • Fuel and cleaning: return the machine full of white diesel and free of caked peat and mud.

Frequently asked questions

Which digger is best for granite ground?

Heavier is better. A 3.5 tonne machine is the realistic minimum for regular rock and boulder work, and a 6 or 9 tonne excavator will be much quicker.

Can you deliver onto Bodmin Moor?

Yes, to wherever the delivery vehicle can safely reach. Tell us about the lane, gates and ground so we can plan the drop-off point.

Do I need permission to fence on the moor?

If the land is registered common land, fencing is likely to need consent under the Commons Act 2006. Check with the relevant authority before you start.

Can I hire a tractor and stone crusher together?

Yes. The Valentini 2.3 Leon stone crusher is PTO driven and needs a suitable tractor, so we usually hire it with the John Deere 6155R. Tell us about the track and we will advise.

Do quad riders need training?

HSE expects all ATV riders to receive adequate training, and recommends a helmet every time. Children under 13 must not use an ATV at work. Make sure riders are trained before the hire starts.

Can you deliver to Cardinham Woods or other forestry sites?

We deliver to wherever the vehicle can safely reach and where you have the landowner’s permission. Give us the access point and any restrictions on forestry roads.

How long does it take to get a machine to Bodmin?

Bodmin is around 40 miles down the A30 from our depot, so it is one of our easier Cornish runs. Same-day delivery is often possible if the machine is available; a day or two of notice is safer for planned work.

Book plant hire in Bodmin

WhatsApp or call 07841 036064 (Mon–Fri 7:30am–5:30pm) with the job, postcode and dates, or use our contact page for longer-term or multi-machine enquiries.

Share this guide WhatsApp Facebook LinkedIn Email

Ready to hire?

Just message us. We’ll sort the rest.

Send the machine, your site postcode and dates. Real people near Okehampton, delivery across Devon, Cornwall, Somerset and Dorset.

Chat on WhatsApp